NCR DIRECT Secure ₹78,000 Subsidy
CFO INTELLIGENCE

Tax Sovereignty: Accelerated Depreciation

How industrial units claim the 40% Section 32 benefit for balance sheet relief.

Published: 06 Aug 2026
Tax Sovereignty: Accelerated Depreciation

Industrial solar installations qualify for 40% accelerated depreciation under Section 32 of the Income Tax Act, dramatically improving project XIRR.

Balance Sheet Strategy

Combined with power savings, the tax shield can pull industrial payback to under 3.5 years for MW-scale plants.

Related Intelligence

MNRE-Listed Channel Partner Central subsidy, end to end
4.9/5 from 243+ Installations Verified homeowner reviews
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

How can I stay updated on solar policy changes in Delhi-NCR? +

Subscribe to the Varka Solar Technical Journal. We publish policy updates within 48 hours of DISCOM or MNRE announcements, with practical impact analysis for NCR customers.

Can I share Varka Solar articles on my business website? +

Yes. Varka Solar articles are freely shareable with attribution. Please link back to the original article URL on varkasolar.in.

How do I contact the Varka editorial team for article corrections? +

Contact us via the Varka support page or WhatsApp with the article URL and correction details. We review and update within 48 hours.

Can I get a personal walkthrough of this topic? +

Yes - book a free site audit or call our engineering desk, and we will walk you through the same numbers on your own bill and roof in a 15-minute call.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Real installations, real bills, real savings - verified across Delhi NCR.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, exact ROI numbers, and the maximum MNRE subsidy you qualify for - in 24 hours. No obligation.

LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant