High-Yield Hardware Stack.
High-density TOPCon modules and industrial string inverters with zero-clipping performance.
Adani Solar
TOPCon technology with 30-year warranty. Optimized for high-thermal industrial environments.
Datasheet →
Solis
Advanced monitoring with 98.7% peak efficiency. Supports full SCADA integration.
Datasheet →CAPEX vs OPEX.
Choose the model that aligns with your corporate treasury and cash flow goals.
Asset Ownership
- ✓ 100% System Ownership
- ✓ Maximum Tax Benefits
- ✓ Free Energy for 25 Years
*Ideal for businesses with high taxable profits.
Zero CAPEX Logic
- ✓ Zero Upfront Cost
- ✓ Fixed Lower Tariffs
- ✓ Varka Handles Full O&M
*Ideal for preserving capital for core operations.
Expertise by Asset Class.
Our engineering squads have specialized protocols for high-intensity industrial clusters.
Manufacturing
High-load factories with consistent 24/7 energy demand profiles.
Warehousing
Massive rooftop footprints optimized for large-scale MW generation.
Commercial Hubs
Office complexes and retail malls looking to fix long-term energy costs.
Precision Deployment.
Industrial solar isn't just about panels. It's about grid stability. Varka Solar's engineering core ensures your factory maintains peak power quality with zero operational downtime during commissioning.
Transform Your
Energy Balance Sheet.
Partner with North India's elite EPC squad for no-compromise MW-scale deployments.
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
How much does a commercial solar plant cost in 2026? +
Bulk CAPEX typically lands at \u20b932,000-\u20b940,000 per kW before benefits - a 100kW plant often ranges \u20b932-38 lakh - and with 40% accelerated depreciation plus net-metering savings, most businesses recover the investment in 3 to 3.5 years.
Does Varka handle HT connections and CEIG approvals? +
Yes. Our in-house team manages HT load approvals, CEIG certification, and 11kV grid synchronization for industrial projects as part of the deployment scope.
Can solar cover my factory's night-time load? +
Net metering banks the daytime surplus so the grid carries your night load at near-zero net cost; for true independence we also engineer hybrid storage options sized to your night shift requirement.
What payback should a business expect on rooftop solar? +
Typical NCR commercial payback is 3-3.5 years with accelerated depreciation and net metering - after that it is cheaper power for the remaining 20+ years of module life.
How big can your commercial installations go? +
We design, procure, and deploy from 25kW office rooftops to 2MW industrial clusters, including ground-mount and carport variants.
Homeowners who made the smart switch.
Real installations, real bills, real savings - verified across Delhi NCR.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”
₹78,000 Subsidy active for NCR projects.
PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.
Secure My Credit →