The Deployment Timeline.
Our disciplined engineering phase-gates ensure 100% success from audit to grid-sync.
Technical Audit
Site visit, structural check, shadow mapping, and load analysis. (Day 1-3)
Liaison & Approval
DISCOM Net-metering application and MNRE subsidy portal registration. (Day 4-14)
Deployment
Physical installation of structures, modules, and inverters. (Day 15-20)
Grid Sync
Bidirectional meter installation and commissioning. (Day 21-45)
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
What is the payback period for a 10kW system? +
Typically, a 10kW system recovers its cost in 3.4 to 3.8 years factoring in subsidies and current tariffs.
How do you manage 11kV grid synchronization? +
Our in-house team handles HT Load Approvals and CEIG Certification for seamless grid connectivity.
Why are structures certified for 180 km/h winds? +
NCR weather requires heavy-duty HDG structures to ensure a 25-year structural lifecycle.
How much roof space is required per kW? +
Typically 80-100 sq.ft. of shadow-free area is required per kW of solar installation.
What is included in Varka Care+ AMC? +
Quarterly thermal audits, DI-water cleaning, string-level monitoring, and 24-hour response time.
What is the timeline for subsidy disbursement? +
Subsidy (up to ₹78,000) is typically released by MNRE within 30-45 business days post-commissioning.
Homeowners who made the smart switch.
Real installations, real bills, real savings - verified across Delhi NCR.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”