NCR DIRECT Secure ₹78,000 Subsidy
ENGINEERING SAFETY

Structural
Reliability.

Solar assets sit on your roof for 25 years. We engineer structures that exceed IS-875 wind-load standards, ensuring zero structural failure even in extreme NCR storms.

🏗️

150km/h Rated

Hot-Dip Galvanized structures with 80-micron coating for lifetime rust protection.

HSE PROTOCOLS

The Varka Safety Shield.

Our on-site squads follow international industrial safety benchmarks.

01 ELECTRICAL

DC/AC Surge Protection

Class-II Surge Protection Devices (SPD) and Earthing pits with <1 Ohm resistance protocols.

02 MECHANICAL

HDG Structural Core

Hot-Dip Galvanized structures certified for 25 years of zero-corrosion in NCR industrial belts.

03 PERSONNEL

HSE Compliance

Full PPE compliance, life-lines for rooftop work, and ESI/PF covered elite engineering squads.

CERTIFICATIONS

Tested by
Extreme Forces.

We don't use generic structures. Every Varka Solar mounting array is custom-calculated for the specific wind-tunnel effects of your rooftop altitude.

IS 875 Structural Compliance
IEEE 519 Power Quality Standards
CEIG Approved Technical Layouts

CRITICAL SAFETY METRICS

Fire Safety Class-A Rated Modules
Lightning Hub Dual LA Protection
MNRE-Listed Channel Partner Central subsidy, end to end
4.9/5 from 243+ Installations Verified homeowner reviews
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

What safety certifications do Varka Solar installations carry? +

All Varka installations comply with IEC 61730 (panel safety), IEC 62109 (inverter safety), IS 16221 (Indian standard for rooftop solar), and CEA regulations for grid-connected systems.

How does Varka ensure electrical safety during installation? +

Varka uses ISI-marked cables, IP65+ junction boxes, DC isolators, AC isolators, surge protection devices, and earth fault protection on every installation. Only licensed electricians work on live circuits.

Does solar installation void my building insurance? +

No. Properly installed solar systems certified to IS standards do not void building insurance. Varka provides completion certificates and test reports that satisfy insurance requirements.

What happens during a power cut? +

Standard grid-tied systems shut down instantly for line-man safety (that is why they are so safe) - battery-ready hybrids keep essentials running. Either way, the equipment itself is certified to disconnect within milliseconds.

How is my roof protected from leaks and water damage? +

Mounting points are rubber-isolated and sealed with UV-grade waterproofing; where drilling is unavoidable, penetrations are re-sealed and water-tested before handover - your waterproofing warranty is preserved.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Real installations, real bills, real savings - verified across Delhi NCR.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, exact ROI numbers, and the maximum MNRE subsidy you qualify for - in 24 hours. No obligation.

LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant