NCR DIRECT Secure ₹78,000 Subsidy
SOCIETY SOLUTIONS

The committee
agreed on solar.

Varka Solar designs shared systems for housing societies — cutting common area electricity bills by 60–90% without disrupting residents. We provide ROI dossiers to make your decision easy.

Society Solar
90% Common Area Savings
OPERATIONAL COMPARISON

What Changes for Your Society.

Before Varka

  • ❌ Escalating Common-Area Electricity Tariffs
  • ❌ High Monthly Maintenance for Residents
  • ❌ Voltage Fluctuations damaging Lifts/Pumps
  • ❌ Dependency on Expensive Diesel Gensets

After Varka

  • ✅ Fixed ₹2.80/unit Effective Energy Cost
  • ✅ Immediate Maintenance Reduction Hub
  • ✅ Clean, Stabilized Solar Grid Feed
  • ✅ Intelligent Hybrid Storage Synergy
RELIABILITY

Hardware for 25 Years.

Societies need durability. We only install Tier-1 components from global leaders like Tata and Adani.

Adani Elan Adani Elan Max Yield
Tata Power Tata 550W Legacy Trust
AGM MASTERY

We'll handle the
Committee Meeting.

We join your society meetings (AGM/EGM) to answer technical questions and present real-world ROI data. Our team speaks 'Committee' and 'Engineering' with equal fluency.

🏙️
Virtual Net Metering (VNM) Ready

Specific to Delhi and NCR hubs, VNM allows solar power generated on the roof of a common building to be distributed across multiple individual residential meters. We manage the complex billing sync with BSES/Tata Hubs.

  • 3D Shadow Mapping & Site Simulation
  • 25-Year Shared Savings Financial Model
  • Zero-Interest Financing Hub for RWAs

RWA Pitch Structure

Payback Period 3.5 Years
Asset Lifecycle 25 Years
Common Area Bill Cut Up to 90%
Resident ROI Positive Cashflow
*Approved for 100kW+ Community Solar in NCR.
GOVERNANCE & EXECUTION

The RWA Solar Lifecycle.

We manage the complexity of multi-owner decision making and high-load synchronization.

PHASE 01

Technical Audit

Forensic shadow mapping and common-area load profiling across all wings.

PHASE 02

AGM Presentation

Varka engineers present the ROI dossier and technical blueprint to the committee.

PHASE 03

VNM Sync

Synchronization of Virtual Net Metering credits with individual resident bills.

PHASE 04

Commencement

Rapid deployment by in-house squads with minimal disruption to society life.

SOCIETY INTELLIGENCE

Society Real Talk.

Terrace usage concerns?

We design systems that co-exist with terrace use. No resident is blocked from their daily routine.

Convincing the skeptics?

The numbers usually do the convincing better than words. We present hard data to the committee.

EMPOWER YOUR SOCIETY

Cut Your Society Bill
by up to 90%.

Get a detailed RWA ROI roadmap and Virtual Net Metering strategy for your community building.

Connect with Engineering
MNRE-Listed Channel Partner Central subsidy, end to end
4.9/5 from 243+ Installations Verified homeowner reviews
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

Can a housing society go solar in Delhi-NCR? +

Yes. Under Group Net Metering, housing societies with common areas (lifts, pumps, corridors) can install solar and split the generation credit across flat owners. Varka manages the full RWA application.

What is the minimum system size for a society solar project? +

Housing societies typically need 20-100kW systems depending on common-area load. Varka conducts a free load audit and designs the optimal configuration for your society layout.

How is subsidy calculated for group housing solar? +

PM Surya Ghar subsidy applies per household in group net metering mode. A 10-unit society can claim up to Rs.7.8 lakh collectively. Varka handles all individual DISCOM applications.

How does the monthly billing work between society and homeowners? +

Under group net metering the DISCOM credits generation against the society's common meter, and our allocation software splits the savings transparently across each flat's bill - the RWA decides the split formula, we do the rest.

Can the rooftop handle solar without damaging the waterproofing? +

Our structures are ballasted and/or clamped with rubber isolation bases - no drilling through membranes where avoidable - and the system design follows a structural engineer's load certification for NCR wind speeds.

What is the typical payback for a society project? +

Most 20-100kW society projects in NCR recover their cost in 3.5-4.5 years through common-area bill savings, after which the society banks the savings - typically into the reserve fund or lower maintenance charges.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Real installations, real bills, real savings - verified across Delhi NCR.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, exact ROI numbers, and the maximum MNRE subsidy you qualify for - in 24 hours. No obligation.

Get My Free Estimate → Chat on WhatsApp ☎ Call Now
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant