Tier-1 Hardware Stack.
We only install components field-tested for Indian heatwaves and extreme dust conditions.
The Real Numbers.
These are real averages from our installations — not best-case estimates.
| Bill | Size | New Bill | ROI |
|---|---|---|---|
| ₹ 3,500 | 3 kW | ₹ 350 | 3.2 Yrs |
| ₹ 6,500 | 5 kW | ₹ 450 | 3.5 Yrs |
| ₹ 12,000 | 10 kW | ₹ 600 | 3.8 Yrs |
| ₹ 30,000 | 25 kW | ₹ 1,200 | 4.2 Yrs |
Technical Excellence.
We don't just bolt panels to roofs. We engineer energy assets using the highest grade components in the industry.
Hot-dip galvanized structures designed to withstand wind speeds up to 150 km/h.
Optimized string configuration for maximum solar harvest even during partial shading.
Connect your system to our Care+ hub for minute-by-minute performance monitoring.
Industrial-grade surge protection and fire-retardant cabling standard on every site.
Zero-Friction Protocol.
We manage the complexity. You manage the savings.
Forensic Audit
Satellite mapping and sanctioned load review to architect the perfect system.
Custom Blueprint
3D design and structural load verification by senior Varka engineers.
Policy Liaison
Zero-friction management of DISCOM Net-metering and subsidy approvals.
Elite Deployment
Rapid installation by in-house squads with 25-year performance warranty.
Secure Your
Villa Sovereignty.
Experience zero-bill luxury with the precision engineering your home deserves.
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
How much does a residential solar system cost in Delhi NCR (2026)? +
A 3kW system typically costs \u20b91.45-1.75 lakh, 5kW around \u20b92.4-2.9 lakh, and 10kW \u20b94.6-5.4 lakh after MNRE subsidy - Varka's estimate tool breaks down your exact number including hardware, structure, and installation.
How much can I actually save on my electricity bill? +
Most Noida/Gurugram homes cut their bill by 80-95% after net metering. A 5kW system on a \u20b94,500/month bill typically pays for itself in under 3.5 years and saves \u20b930+ lakh over 25 years.
How long does the full installation take? +
From engineering audit to grid sync, our certified deployment protocol completes in 21-45 days - including DISCOM net-metering approval and MNRE subsidy filing, which we handle end to end.
Do I need to pay for the subsidy upfront? +
No. You pay only the post-subsidy amount - Varka files the MNRE claim for you and the subsidy (up to \u20b978,000 for this category) is adjusted against the project cost, not paid later to you.
What happens on cloudy days or at night? +
Net metering lets the grid act as your battery: daytime surplus is banked, night consumption is drawn back at zero or minimal cost. Our designs size the system to your daytime load profile for maximum banked credit.
Homeowners who made the smart switch.
Real installations, real bills, real savings - verified across Delhi NCR.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”