Bi-Directional Mastery
Our systems communicate perfectly with your DISCOM’s bi-directional meters. We ensure every unit you export is correctly credited against your import, achieving true zero-cost parity.
Liaison End-to-End
Paperwork is the biggest hurdle to solar. Varka’s dedicated liaison squad manages your technical feasibility, safety certificates, and final DISCOM commissioning.
Grid Topology Matrix.
Choose the engineering architecture that fits your energy sovereignty goals.
On-Grid
Connected directly to DISCOM. Best for bill elimination. Zero battery maintenance.
Hybrid
Connected to Grid + Battery storage. Powers you during outages. High sovereignty.
Off-Grid
Standalone system. Best for farmhouses or remote sites where grid is unreliable.
Turn Your Roof into a
Revenue Center.
Let’s audit your grid capacity and design a high-yield on-grid asset today.
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
What is an on-grid solar system and do I need a battery? +
An on-grid system is connected to the DISCOM grid through a bi-directional net meter - no battery needed. Your daytime surplus is banked as credit and drawn back at night, which is why it offers the fastest payback (about 3.5 years) of any topology.
What happens to my supply during a power cut? +
By regulation, on-grid systems disconnect instantly during a grid outage for safety and reconnect automatically when power returns. If your home needs outage backup, our hybrid architecture adds storage while keeping net-metering benefits.
Is net metering available in Delhi NCR? +
Yes - net metering is active across Noida, Gurgaon, Delhi, Faridabad, and Ghaziabad DISCOMs. Varka's liaison team handles the technical sanction, meter installation, and commissioning with the DISCOM end to end.
How much does an on-grid system cost per kW? +
Post-subsidy, residential on-grid pricing typically lands around \u20b936,000-\u20b945,000 per kW depending on structure type and inverter class; our ROI calculator gives your exact number from your bill amount.
Who installs the bi-directional meter? +
The DISCOM installs the net meter after technical sanction; Varka coordinates the appointment, ensures your plant meets the DISCOM's commissioning checklist, and follows up until export credits appear on your bill.
Homeowners who made the smart switch.
Real installations, real bills, real savings - verified across Delhi NCR.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”