Solutions by Domain.
Residential solar
High-performance solar engineering tailored to your domain.
Explore Residential solar →Commercial & industrial solar
High-performance solar engineering tailored to your domain.
Explore Commercial & industrial solar →The Varka
Engineering Standard.
Every service we offer is backed by North India's most rigorous engineering protocols. We don't just sell solar; we architect high-yield financial assets.
Drone Survey
Precision topographical mapping for MW-scale deployments across uneven industrial terrain.
Li-ion Storage
Hybrid micro-grids for 24/7 industrial uptime and seamless grid-failure switchover.
Asset Monitoring
Real-time string-level analytics via cloud-sync dashboard with predictive failure alerts.
Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
What types of solar installations does Varka Solar do? +
Varka Solar handles residential (1-25kW), commercial/industrial (25kW-2MW), and housing society rooftop solar. We manage DISCOM, MNRE subsidy, and net-metering for all segments.
What is included in Varka Solar Care+ AMC? +
Quarterly DI-water cleaning, thermal imaging audits, string-level IV curve testing, inverter firmware updates, and 24-hour emergency technician response.
Does Varka Solar handle DISCOM and subsidy paperwork? +
Yes. We manage the full chain: technical sanction application, net metering setup, MNRE portal registration, and post-commissioning subsidy disbursement tracking.
How much does solar cost per kilowatt in 2026? +
Residential systems typically run \u20b936,000-\u20b945,000 per kW before subsidy (subsidy adjusts this further down), while commercial builds often land \u20b932,000-\u20b940,000 per kW on larger scale - your exact number comes from our free site audit.
How quickly can my project be completed? +
From the engineering audit to grid connection, our phase-gated protocol completes most residential systems in 21-45 days and industrial clusters within 60-90 days depending on approval timelines.
Homeowners who made the smart switch.
Real installations, real bills, real savings - verified across Delhi NCR.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”