PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

ENGINEERING SIMPLICITY

The Varka
Protocol.

We have perfected the 5-stage protocol to transition any property to solar independence. We handle every technical and bureaucratic layer.

01

Forensic Audit

We use high-resolution satellite data to map your roof's shadow profile across all 365 days of the year. No guesswork, only engineering data.

  • ✓ 365-Day Shadow Mapping
  • ✓ Accurate Sun-Hour Yield
  • ✓ Sanctioned Load Review
Forensic Audit
02

Custom Blueprint

Our structural engineers design a custom 3D layout, ensuring maximum yield and structural safety. Every mount is calculated for local wind-speed loads.

  • ✓ 3D Panel Visualization
  • ✓ Structural Load Verification
  • ✓ Cable-Route Optimization
Custom Blueprint
03

Bureaucratic Shield

We handle the PM Surya Ghar application, DISCOM Net-metering approvals, and CEIG certifications. Zero friction, 100% compliance guaranteed.

  • ✓ Zero Paperwork Friction
  • ✓ MNRE Portal Management
  • ✓ SLA-Driven Approvals
Bureaucratic Shield

Ready for Your
Independence?

Our engineers are standing by to perform your remote technical audit.

MNRE-Listed Channel Partner Central subsidy, end to end
Project updates in one place Customer portal and support
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

How long does a solar installation take? +

For a residential system (3–10kW), the physical installation takes 1–2 days. DISCOM inspection and net-metering approval add 15–30 working days. Varka manages the full process.

What is included in the free site audit? +

Our forensic site audit includes satellite shadow mapping, rooftop structural assessment, sanctioned load review, DISCOM compatibility check, and a full ROI projection report.

Do I need to be present during installation? +

No. Varka assigns a dedicated Project Manager who coordinates with your building manager or security. All installation activities are documented with photos and shared with you.

When does the money actually start flowing back? +

From commissioning day: the DISCOM completes net-meter synchronization within a few weeks, and your first post-install bill shows the export credits - most homeowners see 80-95% bill reduction from that billing cycle.

What payment schedule should I expect? +

Typical flow is a small booking amount, then milestone-linked payments (material delivery, installation, handover) - so your money only ever sits one step ahead of the work, never the other way round.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Experiences shared by our customers.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, a site-specific savings estimate, and the maximum MNRE subsidy you qualify for. Timelines depend on site assessment. No obligation.