NCR DIRECT Secure ₹78,000 Subsidy
Digital Marketing

Googel ads

Location: Gurugram, Haryana, IND
Type: PART-TIME
Experience: 2-5 years

Mission Brief.

vdfvd

Technical Pre-requisites

  • vdvfd

Varka Elite Benefits

We provide the tools and sovereignty for engineers to do their best work.

✓ High-Yield Performance Bonus
✓ Advanced Engineering SaaS Access
✓ NCR Strategic Housing Support
✓ Health Sovereignty Package

Direct Intake.

Your data goes directly to the Engineering Council.

MNRE-Listed Channel Partner Central subsidy, end to end
4.9/5 from 243+ Installations Verified homeowner reviews
25-Year Module Warranty Tier-1 hardware only
24-Hour Response Protocol Service, app-monitored
QUICK ANSWERS

Questions, Answered.

Straight answers from our engineers - no jargon, no sales speak.

How do I apply for a job at Varka Solar? +

Apply directly through the Varka Solar careers page. Fill the application form with your experience, qualifications, and preferred role. Our HR team responds within 5 working days.

What is the hiring process at Varka Solar? +

The process has 3 stages: application review, technical phone screening, and a field or office-based practical assessment. Total timeline is 2-3 weeks from application.

Are Varka Solar jobs full-time or contract-based? +

Core roles are full-time with benefits. Installation squad positions offer a mix of fixed monthly retainer and per-project bonuses. Contract roles are available for senior technical specialists.

Does Varka sponsor certifications and licenses? +

Yes - we fund MNRE-recognized training, solar certifications, and license renewals for field and design roles, with a clear bookable training calendar.

What profile is doing well at Varka right now? +

DISCOM liaison and field engineering roles are growing fastest with our NCR project pipeline - if you know the PVVNL or DHBVN process, you will be quoting rate-cards in week one.

Browse the full Knowledge Base →
CLIENT STORIES

Homeowners who made the smart switch.

Real installations, real bills, real savings - verified across Delhi NCR.

★★★★★

“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”

R
Rahul Malhotra Gurgaon 12kW Solar
★★★★★

“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”

M
Meera Krishnan Noida 45kW Solar
★★★★

“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”

A
Aman Verma Delhi 6kW Solar
FREE SITE AUDIT & SUBSIDY ESTIMATE

Your roof is earning nothing.
Let’s change that.

Get a free engineering audit, exact ROI numbers, and the maximum MNRE subsidy you qualify for - in 24 hours. No obligation.

LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant