Architected for Delhi.
Residential Sovereignty
Eliminate bills for your Delhi bungalow. Fully integrated with PM Surya Ghar subsidies up to ₹78,000.
Industrial MW Scale
High-load energy ecosystems for Delhi factories and hospitals. Mission-critical stability and 25-year warranty.
Institutional Solar
Zero-investment OPEX models for schools and housing societies in Delhi. Guaranteed savings from Day 1.
15 MW+ Deployed.
Our real-time yield analytics center monitors every photon across North India's most ambitious assets.
The Future of
Delhi is Solar.
Secure energy independence with India's most advanced solar engineering lab. Our engineers are currently accepting Delhi site surveys.
Technical Audit
Enter details to receive a high-fidelity satellite shade-map of your rooftop.
Get Free Quote →Questions, Answered.
Straight answers from our engineers - no jargon, no sales speak.
How soon can Varka Solar install locally? +
As a Delhi deployment hub, Varka keeps resident engineering crews and a stocked spares warehouse nearby - most local sites get a site audit within 48 hours and installation within 2-3 weeks of approval.
Do you handle local DISCOM and net-metering paperwork? +
Yes - the complete DISCOM application, local approvals, net-metering licence, and subsidy filing are handled by our in-house liaison team, and you can track every stage on your project portal.
Are the PM Surya Ghar subsidies available here? +
Yes - residential systems qualify for the 78,000 rupee central subsidy under the PM Surya Ghar scheme, and our team files it for you at your preferred bank.
What warranty do local installations carry? +
Every installation here carries a 25-year module performance warranty, 10-year product warranty, 5-year workmanship warranty, and free Care+ service for year one.
Homeowners who made the smart switch.
Real installations, real bills, real savings - verified across Delhi NCR.
“Varka delivered our 12kW Gurgaon plant in 21 days, including all DISCOM paperwork. Generation has matched the 3D simulation at 99.2%.”
“The 45kW rooftop on our factory has cut our grid bill by 78%. Their team handled accelerated depreciation documentation too.”
“Clean installation, professional engineers. Net metering took a bit longer than promised but support stayed with us throughout.”