Industrial Solar Plants in Bihar
MW-scale industrial rooftop, ground-mount and carport solar for factories, SEZs and industrial parks - EPC to O&M. Varka Solar delivers it across Bihar with local squads and full SBPDCL / NBPDCL (South & North Bihar Power) paperwork.
Industrial Solar in Bihar
Bihar averages 4.7-5.2 kWh/m²/day of daily solar irradiance and is served by SBPDCL / NBPDCL (South & North Bihar Power). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.
- In-house squads: no subcontracting — our engineers install every system.
- DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
- Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
- 25-year warranty: performance cover plus remote telemetry on every plant.
Industrial Solar Districts in Bihar
Drill into any district for city and area level coverage.
Other Solar Services in Bihar
The full Varka stack, state-wide.
Frequently Asked Questions
What size industrial solar plant do I need?
We size systems from 50kW to multi-MW based on your sanctioned load, consumption pattern and available roof/land area.
Can solar run 24x7 for factories?
Solar offsets daytime load; for 24x7 plants we pair it with net metering, or hybrid systems with storage for critical loads.
Do you provide O&M after installation?
Yes - our AMC plans include remote monitoring, quarterly cleaning, inverter servicing and performance guarantees.
What is the PM Surya Ghar subsidy in Bihar?
Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with SBPDCL / NBPDCL (South & North Bihar Power).
How fast is installation in Bihar?
Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on SBPDCL / NBPDCL (South & North Bihar Power) approval timelines.
Industrial Solar in Bihar
Free survey, fixed quote and full DISCOM paperwork — within 48 hours.