PM Surya Ghar Muft Bijli Yojana in Karnataka
End-to-end PM Surya Ghar Yojana support - registration, subsidy application, DISCOM approvals and 300 units free electricity per month. Varka Solar delivers it across Karnataka with local squads and full BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore paperwork.
PM Surya Ghar in Karnataka
Karnataka averages 4.8-5.6 kWh/m²/day of daily solar irradiance and is served by BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore. That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.
- In-house squads: no subcontracting — our engineers install every system.
- DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
- Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
- 25-year warranty: performance cover plus remote telemetry on every plant.
PM Surya Ghar Districts in Karnataka
Drill into any district for city and area level coverage.
Other Solar Services in Karnataka
The full Varka stack, state-wide.
Frequently Asked Questions
Who is eligible for PM Surya Ghar subsidy?
Indian residential consumers with a valid electricity connection, roof access and a savings/current bank account are eligible.
How do I apply for the PM Surya Ghar subsidy?
Register on pmsuryaghar.gov.in, get a feasibility study, install through an empanelled vendor, then the subsidy is credited to your bank account. Varka handles the whole process.
How much does PM Surya Ghar cover?
Up to ₹78,000 for 3-10kW systems. With net metering, many homes see near-zero electricity bills (up to 300 units/month free).
What is the PM Surya Ghar subsidy in Karnataka?
Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore.
How fast is installation in Karnataka?
Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on BESCOM / MESCOM / HESCOM / GESCOM / CESC Mysore approval timelines.
PM Surya Ghar in Karnataka
Free survey, fixed quote and full DISCOM paperwork — within 48 hours.