Home Solar Solutions in Assam
Home solar with 100% subsidy support - flats, villas, farmhouses and bungalows. Save 90-100% on electricity bills. Varka Solar delivers it across Assam with local squads and full APDCL (Assam Power Distribution Company) paperwork.
Residential Solar in Assam
Assam averages 4.2-4.8 kWh/m²/day of daily solar irradiance and is served by APDCL (Assam Power Distribution Company). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.
- In-house squads: no subcontracting — our engineers install every system.
- DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
- Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
- 25-year warranty: performance cover plus remote telemetry on every plant.
Residential Solar Districts in Assam
Drill into any district for city and area level coverage.
Other Solar Services in Assam
The full Varka stack, state-wide.
Frequently Asked Questions
What is the PM Surya Ghar subsidy amount?
₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW systems for residential consumers.
Can society flats get solar?
Yes - common-area solar and individual balcony/rooftop systems for flats are both possible; we handle RWA approvals too.
Will solar work in winter and monsoon?
Yes - panels generate in diffuse light too. Annual output still comfortably covers most homes even in cloudy regions.
What is the PM Surya Ghar subsidy in Assam?
Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with APDCL (Assam Power Distribution Company).
How fast is installation in Assam?
Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on APDCL (Assam Power Distribution Company) approval timelines.
Residential Solar in Assam
Free survey, fixed quote and full DISCOM paperwork — within 48 hours.