Home Solar Solutions in Haryana
Home solar with 100% subsidy support - flats, villas, farmhouses and bungalows. Save 90-100% on electricity bills. Varka Solar delivers it across Haryana with local squads and full UHBVN / DHBVN (Haryana Power Utilities) paperwork.
Residential Solar in Haryana
Haryana averages 4.8-5.3 kWh/m²/day of daily solar irradiance and is served by UHBVN / DHBVN (Haryana Power Utilities). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.
- In-house squads: no subcontracting — our engineers install every system.
- DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
- Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
- 25-year warranty: performance cover plus remote telemetry on every plant.
Residential Solar Districts in Haryana
Drill into any district for city and area level coverage.
Other Solar Services in Haryana
The full Varka stack, state-wide.
Frequently Asked Questions
What is the PM Surya Ghar subsidy amount?
₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW systems for residential consumers.
Can society flats get solar?
Yes - common-area solar and individual balcony/rooftop systems for flats are both possible; we handle RWA approvals too.
Will solar work in winter and monsoon?
Yes - panels generate in diffuse light too. Annual output still comfortably covers most homes even in cloudy regions.
What is the PM Surya Ghar subsidy in Haryana?
Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with UHBVN / DHBVN (Haryana Power Utilities).
How fast is installation in Haryana?
Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on UHBVN / DHBVN (Haryana Power Utilities) approval timelines.
Residential Solar in Haryana
Free survey, fixed quote and full DISCOM paperwork — within 48 hours.