NCR DIRECT Secure ₹78,000 Subsidy
Gujarat · GJ · 5.2-5.8 kWh/m²/day

Rooftop Solar in Gujarat

Residential & commercial rooftop solar systems sized by your roof area, shadow analysis and monthly consumption. Varka Solar delivers it across Gujarat with local squads and full PGVCL / UGVCL / MGVCL / DGVCL + Torrent Power (Ahmedabad-Surat) paperwork.

5.2-5.8 kWh/m²/daySolar Irradiance
PGVCL / UGVCL / MGVCL / DGVCL + Torrent Power (Ahmedabad-Surat)DISCOM
12+Districts Covered
₹78,000Max Subsidy

Rooftop Solar in Gujarat

Gujarat averages 5.2-5.8 kWh/m²/day of daily solar irradiance and is served by PGVCL / UGVCL / MGVCL / DGVCL + Torrent Power (Ahmedabad-Surat). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.

  • In-house squads: no subcontracting — our engineers install every system.
  • DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
  • Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
  • 25-year warranty: performance cover plus remote telemetry on every plant.

Frequently Asked Questions

How much roof area is needed for a 3kW solar system?

About 200-240 sq ft is enough for a 3kW system with 550Wp panels. A 5kW system needs roughly 320-380 sq ft.

Can rooftop solar run during power cuts?

Standard grid-tied systems shut off during outages for safety. With a hybrid inverter + battery backup, essential loads keep running.

What is the payback period for rooftop solar?

With PM Surya Ghar subsidy and net metering, most residential systems pay back in 3-5 years and last 25+ years.

What is the PM Surya Ghar subsidy in Gujarat?

Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with PGVCL / UGVCL / MGVCL / DGVCL + Torrent Power (Ahmedabad-Surat).

How fast is installation in Gujarat?

Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on PGVCL / UGVCL / MGVCL / DGVCL + Torrent Power (Ahmedabad-Surat) approval timelines.

Rooftop Solar in Gujarat

Free survey, fixed quote and full DISCOM paperwork — within 48 hours.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant