NCR DIRECT Secure ₹78,000 Subsidy
Puducherry · PY · 5.0-5.5 kWh/m²/day

Rooftop Solar in Puducherry

Residential & commercial rooftop solar systems sized by your roof area, shadow analysis and monthly consumption. Varka Solar delivers it across Puducherry with local squads and full PED (Puducherry Electricity Department) paperwork.

5.0-5.5 kWh/m²/daySolar Irradiance
PED (Puducherry Electricity Department)DISCOM
2+Districts Covered
₹78,000Max Subsidy

Rooftop Solar in Puducherry

Puducherry averages 5.0-5.5 kWh/m²/day of daily solar irradiance and is served by PED (Puducherry Electricity Department). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.

  • In-house squads: no subcontracting — our engineers install every system.
  • DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
  • Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
  • 25-year warranty: performance cover plus remote telemetry on every plant.

Rooftop Solar Districts in Puducherry

Drill into any district for city and area level coverage.

Frequently Asked Questions

How much roof area is needed for a 3kW solar system?

About 200-240 sq ft is enough for a 3kW system with 550Wp panels. A 5kW system needs roughly 320-380 sq ft.

Can rooftop solar run during power cuts?

Standard grid-tied systems shut off during outages for safety. With a hybrid inverter + battery backup, essential loads keep running.

What is the payback period for rooftop solar?

With PM Surya Ghar subsidy and net metering, most residential systems pay back in 3-5 years and last 25+ years.

What is the PM Surya Ghar subsidy in Puducherry?

Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with PED (Puducherry Electricity Department).

How fast is installation in Puducherry?

Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on PED (Puducherry Electricity Department) approval timelines.

Rooftop Solar in Puducherry

Free survey, fixed quote and full DISCOM paperwork — within 48 hours.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant