PM Surya Ghar Empanelled · Up to ₹78,000 Direct Bank Subsidy (PVVNL Desk)
DELHI-NCR ROOFTOP SHOWROOM

Select your city

Personalize local DISCOM net-metering guidance across packages and calculators. Choosing a city never opens a form.

Mumbai Suburban · Maharashtra · MH

Solar Panel Installation in Malad, Maharashtra

Looking for the best solar company in Malad? Varka Solar installs rooftop, commercial and industrial systems across Malad with local engineers and end-to-end DISCOM and subsidy management.

2Areas Covered
2Pincodes Served
5.0-5.6 kWh/m²/daySolar Irradiance
MSEDCL (Maharashtra State Electricity Distribution)DISCOM

Solar in Malad

Malad enjoys 5.0-5.6 kWh/m²/day daily solar irradiance with MSEDCL (Maharashtra State Electricity Distribution) as the local utility — ideal conditions for rooftop solar payback in 3-5 years. Varka Solar's local team covers Malad West, Goregaon.

We size systems from your last 12 months of bills, then handle the DISCOM application, net metering and PM Surya Ghar subsidy from start to finish. Most Malad installations complete within 7-15 working days.

Areas We Cover in Malad

Locality level installation and maintenance support.

Nearby Cities

Also served by the Mumbai Suburban team.

Pincodes Served in Malad

400064400063

Frequently Asked Questions

What is the solar subsidy in Maharashtra?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full MSEDCL (Maharashtra State Electricity Distribution) application for you.

How much does a solar system cost in Malad?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Malad, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Malad?

Residential rooftops complete in 7-15 working days after site survey and MSEDCL (Maharashtra State Electricity Distribution) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in Maharashtra?

Yes. Our team manages the complete MSEDCL (Maharashtra State Electricity Distribution) net metering application, meter installation and inspection process for every project in Maharashtra.

Get solar installed in Malad

Free survey, fixed quote, full DISCOM paperwork — within 48 hours.

60-Second Estimate