NCR DIRECT Secure ₹78,000 Subsidy
East Khasi Hills · Meghalaya · ML

Solar Panel Installation in Shillong, Meghalaya

Looking for the best solar company in Shillong? Varka Solar installs rooftop, commercial and industrial systems across Shillong with local engineers and end-to-end DISCOM and subsidy management.

0Areas Covered
30Pincodes Served
4.3-4.8 kWh/m²/daySolar Irradiance
MePDCL (Meghalaya Power Distribution)DISCOM

Solar in Shillong

Shillong enjoys 4.3-4.8 kWh/m²/day daily solar irradiance with MePDCL (Meghalaya Power Distribution) as the local utility — ideal conditions for rooftop solar payback in 3-5 years. Varka Solar's local team covers the full district.

We size systems from your last 12 months of bills, then handle the DISCOM application, net metering and PM Surya Ghar subsidy from start to finish. Most Shillong installations complete within 7-15 working days.

Pincodes Served in Shillong

793001793002793003793004793005793006793007793008793009793010793011793012793013793014793015793016793017793018793019793020793021793022793023793024793025793026793027793028793029793030

Frequently Asked Questions

What is the solar subsidy in Meghalaya?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full MePDCL (Meghalaya Power Distribution) application for you.

How much does a solar system cost in Shillong?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Shillong, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Shillong?

Residential rooftops complete in 7-15 working days after site survey and MePDCL (Meghalaya Power Distribution) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in Meghalaya?

Yes. Our team manages the complete MePDCL (Meghalaya Power Distribution) net metering application, meter installation and inspection process for every project in Meghalaya.

Get solar installed in Shillong

Free survey, fixed quote, full DISCOM paperwork — within 48 hours.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant