NCR DIRECT Secure ₹78,000 Subsidy
Tamil Nadu · TN

Solar Panel Installation in Madurai, Tamil Nadu

Varka Solar's local squad covers all 1 cities and towns of Madurai district — site survey, DISCOM approvals, net metering and PM Surya Ghar subsidy, all in-house.

1Cities Covered
5.2-5.8 kWh/m²/daySolar Irradiance
TANGEDCODISCOM
7-15 daysResidential Install

Why Madurai Trusts Varka Solar

Madurai sits in a 5.2-5.8 kWh/m²/day irradiance zone served by TANGEDCO. We handle residential rooftops, society common-area systems and commercial plants across the district — with local engineers who know every sub-station and approval desk.

Covered cities and towns: Madurai. Every project ships with a transparent timeline, 25-year performance warranty and remote monitoring.

Cities in Madurai District

Click a city for area and pincode level coverage.

Frequently Asked Questions

What is the solar subsidy in Tamil Nadu?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full TANGEDCO application for you.

How much does a solar system cost in Madurai?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Madurai, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Madurai?

Residential rooftops complete in 7-15 working days after site survey and TANGEDCO approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in Tamil Nadu?

Yes. Our team manages the complete TANGEDCO net metering application, meter installation and inspection process for every project in Tamil Nadu.

Need solar in Madurai?

Local engineers, fixed pricing and full DISCOM paperwork — free site survey.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant