NCR DIRECT Secure ₹78,000 Subsidy
Uttarakhand · UK

Solar Panel Installation in Haridwar, Uttarakhand

Varka Solar's local squad covers all 2 cities and towns of Haridwar district — site survey, DISCOM approvals, net metering and PM Surya Ghar subsidy, all in-house.

2Cities Covered
4.8-5.3 kWh/m²/daySolar Irradiance
UPCL (Uttarakhand Power Corporation)DISCOM
7-15 daysResidential Install

Why Haridwar Trusts Varka Solar

Haridwar sits in a 4.8-5.3 kWh/m²/day irradiance zone served by UPCL (Uttarakhand Power Corporation). We handle residential rooftops, society common-area systems and commercial plants across the district — with local engineers who know every sub-station and approval desk.

Covered cities and towns: Haridwar, Roorkee. Every project ships with a transparent timeline, 25-year performance warranty and remote monitoring.

Cities in Haridwar District

Click a city for area and pincode level coverage.

Frequently Asked Questions

What is the solar subsidy in Uttarakhand?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full UPCL (Uttarakhand Power Corporation) application for you.

How much does a solar system cost in Haridwar?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Haridwar, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Haridwar?

Residential rooftops complete in 7-15 working days after site survey and UPCL (Uttarakhand Power Corporation) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in Uttarakhand?

Yes. Our team manages the complete UPCL (Uttarakhand Power Corporation) net metering application, meter installation and inspection process for every project in Uttarakhand.

Need solar in Haridwar?

Local engineers, fixed pricing and full DISCOM paperwork — free site survey.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant