NCR DIRECT Secure ₹78,000 Subsidy
West Bengal · WB · 4.4-4.9 kWh/m²/day

Industrial Solar Plants in West Bengal

MW-scale industrial rooftop, ground-mount and carport solar for factories, SEZs and industrial parks - EPC to O&M. Varka Solar delivers it across West Bengal with local squads and full WBSEDCL + CESC (Kolkata) paperwork.

4.4-4.9 kWh/m²/daySolar Irradiance
WBSEDCL + CESC (Kolkata)DISCOM
10+Districts Covered
₹78,000Max Subsidy

Industrial Solar in West Bengal

West Bengal averages 4.4-4.9 kWh/m²/day of daily solar irradiance and is served by WBSEDCL + CESC (Kolkata). That combination keeps solar paybacks in the 3-5 year range for most residential systems — before factoring in the PM Surya Ghar subsidy of up to ₹78,000.

  • In-house squads: no subcontracting — our engineers install every system.
  • DISCOM & subsidy: net metering, approvals and PM Surya Ghar handled end to end.
  • Tier-1 hardware: TOPCon modules, industrial inverters, HDG structures.
  • 25-year warranty: performance cover plus remote telemetry on every plant.

Frequently Asked Questions

What size industrial solar plant do I need?

We size systems from 50kW to multi-MW based on your sanctioned load, consumption pattern and available roof/land area.

Can solar run 24x7 for factories?

Solar offsets daytime load; for 24x7 plants we pair it with net metering, or hybrid systems with storage for critical loads.

Do you provide O&M after installation?

Yes - our AMC plans include remote monitoring, quarterly cleaning, inverter servicing and performance guarantees.

What is the PM Surya Ghar subsidy in West Bengal?

Up to ₹78,000 for residential systems (₹30,000 up to 2kW, ₹60,000 for 2-3kW, ₹78,000 for 3-10kW), credited directly to your bank account. Varka files the complete application with WBSEDCL + CESC (Kolkata).

How fast is installation in West Bengal?

Residential projects complete in 7-15 working days; commercial plants up to 100kW in 30-45 days, depending on WBSEDCL + CESC (Kolkata) approval timelines.

Industrial Solar in West Bengal

Free survey, fixed quote and full DISCOM paperwork — within 48 hours.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant