NCR DIRECT Secure ₹78,000 Subsidy
West Bengal · WB

Solar Panel Installation in Darjeeling, West Bengal

Varka Solar's local squad covers all 2 cities and towns of Darjeeling district — site survey, DISCOM approvals, net metering and PM Surya Ghar subsidy, all in-house.

2Cities Covered
4.4-4.9 kWh/m²/daySolar Irradiance
WBSEDCL + CESC (Kolkata)DISCOM
7-15 daysResidential Install

Why Darjeeling Trusts Varka Solar

Darjeeling sits in a 4.4-4.9 kWh/m²/day irradiance zone served by WBSEDCL + CESC (Kolkata). We handle residential rooftops, society common-area systems and commercial plants across the district — with local engineers who know every sub-station and approval desk.

Covered cities and towns: Siliguri, Darjeeling. Every project ships with a transparent timeline, 25-year performance warranty and remote monitoring.

Cities in Darjeeling District

Click a city for area and pincode level coverage.

Frequently Asked Questions

What is the solar subsidy in West Bengal?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full WBSEDCL + CESC (Kolkata) application for you.

How much does a solar system cost in Darjeeling?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Darjeeling, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Darjeeling?

Residential rooftops complete in 7-15 working days after site survey and WBSEDCL + CESC (Kolkata) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in West Bengal?

Yes. Our team manages the complete WBSEDCL + CESC (Kolkata) net metering application, meter installation and inspection process for every project in West Bengal.

Need solar in Darjeeling?

Local engineers, fixed pricing and full DISCOM paperwork — free site survey.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant