NCR DIRECT Secure ₹78,000 Subsidy
Maligaon · Guwahati · Assam

Solar Panel Installation in Guwahati — 781010

Varka Solar covers pincode 781010 (Maligaon, Guwahati) with local engineers, fast DISCOM approvals and complete PM Surya Ghar subsidy handling.

781010Service Pincode
4.2-4.8 kWh/m²/daySolar Irradiance
APDCL (Assam Power Distribution Company)DISCOM
48 hrsSurvey Slot

Solar for Pincode 781010

Residents and businesses in the 781010 area of Guwahati get the same Varka standard: bill analysis, 3D shadow study, Tier-1 panels, APDCL (Assam Power Distribution Company) net metering and up to ₹78,000 PM Surya Ghar subsidy.

Book a free survey for your roof in 781010 — our team arrives with a shadow-analysis rig and a fixed-price proposal within 48 hours.

Frequently Asked Questions

What is the solar subsidy in Assam?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full APDCL (Assam Power Distribution Company) application for you.

How much does a solar system cost in Maligaon, Guwahati?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Maligaon, Guwahati, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Maligaon, Guwahati?

Residential rooftops complete in 7-15 working days after site survey and APDCL (Assam Power Distribution Company) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in Assam?

Yes. Our team manages the complete APDCL (Assam Power Distribution Company) net metering application, meter installation and inspection process for every project in Assam.

Solar for pincode 781010?

Free roof survey and fixed-price quote within 48 hours.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant