NCR DIRECT Secure ₹78,000 Subsidy
Gurugram · Haryana · HR

Solar Panel Installation in Palam Vihar, Haryana

Looking for the best solar company in Palam Vihar? Varka Solar installs rooftop, commercial and industrial systems across Palam Vihar with local engineers and end-to-end DISCOM and subsidy management.

2Areas Covered
1Pincodes Served
4.8-5.3 kWh/m²/daySolar Irradiance
UHBVN / DHBVN (Haryana Power Utilities)DISCOM

Solar in Palam Vihar

Palam Vihar enjoys 4.8-5.3 kWh/m²/day daily solar irradiance with UHBVN / DHBVN (Haryana Power Utilities) as the local utility — ideal conditions for rooftop solar payback in 3-5 years. Varka Solar's local team covers Palam Vihar A-D Block, South City 1.

We size systems from your last 12 months of bills, then handle the DISCOM application, net metering and PM Surya Ghar subsidy from start to finish. Most Palam Vihar installations complete within 7-15 working days.

Areas We Cover in Palam Vihar

Locality level installation and maintenance support.

Pincodes Served in Palam Vihar

122017

Frequently Asked Questions

What is the solar subsidy in Haryana?

Under PM Surya Ghar Muft Bijli Yojana, residential consumers get up to ₹30,000 for systems up to 2kW, ₹60,000 for 2-3kW, and ₹78,000 for 3-10kW, credited directly to their bank account. Varka Solar completes the full UHBVN / DHBVN (Haryana Power Utilities) application for you.

How much does a solar system cost in Palam Vihar?

A 3kW rooftop system costs roughly ₹1.6-2.1 lakh before subsidy in Palam Vihar, and about ₹1.0-1.5 lakh after the PM Surya Ghar subsidy. Commercial and industrial systems start around ₹45,000 per kW.

How long does solar installation take in Palam Vihar?

Residential rooftops complete in 7-15 working days after site survey and UHBVN / DHBVN (Haryana Power Utilities) approval. Commercial projects up to 100kW commission in 30-45 days.

Does Varka Solar handle net metering in Haryana?

Yes. Our team manages the complete UHBVN / DHBVN (Haryana Power Utilities) net metering application, meter installation and inspection process for every project in Haryana.

Get solar installed in Palam Vihar

Free survey, fixed quote, full DISCOM paperwork — within 48 hours.

60-Second Estimate
LIVE ALERT

₹78,000 Subsidy active for NCR projects.

PM Surya Ghar Muft Bijli Yojana is now live in Delhi-NCR for August 2026.

Secure My Credit →
SECURE AUDIT

Secure Your
Solar Audit.

Start by defining your identity and operational zone.

TECHNICAL CONTEXT

Project Parameters.

This data calibrates our 3D shading engines for your rooftop.

L

Request
Received.

Our senior engineering lead will contact you within 4 business hours for the audit schedule.

☀️

Varka AI

Solar Consultant